Martin Dock restoration aims to renew “Longview’s living room”
Rotary Club of Longview is celebrating its 100th year with a multimillion-dollar campaign to restore an outdoor recreation and entertainment venue at the city’s largest public park.
The most ambitious project in the club’s history, Rotary’s fund drive aims to raise $3 million to $4 million to rebuild and expand Martin Dock, which is slowly sinking into the waters of Lake Sacajawea Park.
The project is expected to take at least two years to complete, relying on contributions from big donors, the public and various grants.
Brian Magnuson, the project leader, envisions a shoreline dock with a covered stage “that will last 100 years.” It will include a boardwalk, kayak launch and terraced natural amphitheater on the sloping lawn facing the dock.
Magnuson coined the term “Longview’s living room” to underline the importance of Martin Dock to the community, hosting weekly summer concerts, the annual Go 4th festival and other events year-round. The amphitheater and surrounding lawns can accommodate several thousand spectators.
Magnuson and other Rotarians promoted the project at the July 2-4 lakeside festival near the dock site, displaying architectural drawings and seeking pledges for commemorative bricks being sold in the fund drive.
A gift that helped transform the park
The original wooden dock for kids’ fishing and community concerts was donated to the city by Rotarian Harry F. Martin in 1962 and became the catalyst for transforming then-scruffy Sacajawea Park into today’s recreational jewel.
Martin, a Longview pioneer and moving company owner who lived across the street from the park, noticed that youngsters were slipping on the lake banks and could barely cast their fishing lines to the water.
His original platform, 20 feet by 40 feet with a 3-foot railing, was eventually replaced by a more spacious wood and cement dock built by the city. It’s this second version with pilings in the lake and foundation in the marshy shore that is sagging into the water and needs replacement.
Martin Dock, as it came to be known, ignited public interest in upgrading the park.
Long after the park was carved from a slough when the Longview townsite was diked in 1923, the sloping lake banks remained undeveloped: weedy turf dotted with mole hills, dirt paths and reed-choked shorelines. Lake water was muddy and covered with algae. The only creature comforts were a few park benches set here and there for viewing wildlife.
Today’s amenities, including well-tended lawns and plantings, bike and walking paths, picnic tables and shelters, light poles, public restrooms and an authentic Japanese garden, were years away when Martin decided to donate the dock.
After the 1963 dedication, The Longview Daily News called it the “first structural improvement on the shores of the 1 1/2-mile lake” since the town’s founding. “It revives interest … and makes it possible for this underused civic asset to be better utilized.”
Martin Dock, as it came to be known, ignited public interest in upgrading the park. City agencies began allocating tax money for improvements and service clubs and private individuals chimed in with donations.
Maintained by the Parks and Recreation Department, the 127-acre crescent with 3.5 miles of trails is a showplace for the community and tourist attraction. The arboretum around the lake has over 100 tree species, underlining Longview’s Tree City USA designation. Rotary donated a giant sequoia to the collection for its 2026 centennial.
Building support for Martin Dock restoration
With Martin Dock deteriorating due to its watery location, the city sought state funds several years ago for a rebuild. When the application was turned down, Parks and Rec put out feelers for local help.
Rotary Club of Longview, with 135 members, learned about the need and decided to take on the dock project as a major centennial gift to the city, population 38,000.
For the centennial, the club also funded a Rotary Meeting Room for community use at the Longview Public Library, a nearly $49,000 gift unveiled April 25 at the library’s 100th birthday party. Magnuson also led that project.
The project is expected to take at least two years to complete, relying on contributions from big donors, the public and various grants.
Magnuson, 69, is a former construction company owner, communications entrepreneur and current board member of several public agencies. He is accustomed to dealing with the intricacies of construction permits, building on soggy land and project financing.
To get the dock project rolling, $120,000 is being allocated for site studies and building permits, Magnuson said.
With one local pledge of $500,000 in hand, other residents have indicated they’ll contribute a major share of the costs, Magnuson said.
“I envision a donor board at the project site listing the names of major donors,” he said. Stage naming rights could be a source of funding, along with sales of paving bricks at $250 and $450 apiece with donor names placed at the site.
Rotary’s centennial gala, held Sept. 25 at the town’s Hotel Monticello, also helped raise funds for the Martin Dock project.
Editor’s update: This account reflects reporting before the September 25, 2026 gala. In a September 28 report, KLOG described more than $1 million in additional donations and commitments, including pledges and a donated pavilion. The report also described the earlier $500,000 pledge as a matching gift. Construction had not been scheduled as of that report.
Related reading: Explore more community projects in UTS’s Service in Action stories.



























